Aerial view of photovoltaic rows on industrial roofs

Commercial rooftop systems

Roof waterproofing, solar & storage

Plan the weatherproof envelope, rooftop PV and battery dispatch together, from the first roof survey to the operating handover.

Industrial rooftop PV array

Where rooftop projects run into trouble

Water at roof interfaces

Mounts, laps and service penetrations interrupt the drainage plane. Each interface needs a waterproofing detail.

Limited structural reserve

Existing decks and purlins may have little capacity for added modules, ballast or maintenance loads.

Generation outside demand hours

Midday PV output can exceed site demand, while evening operations still draw from the grid.

Gaps between contractors

Separate roof and electrical packages can leave leak tracing, repairs and access without a clear owner.

One roof, coordinated from the deck up

The membrane sheds water. The mounting system transfers loads to the structure. Above them, PV modules feed the site through an inverter. Storage can move surplus generation into a later demand period.

Choose the roof build-up first. On a metal deck, a fully adhered TPO membrane is one option. A single-ply TPO assembly uses a different fastening detail. Match the mounting interface to the selected assembly.

System architecture

Building waterproofing layer

Continuous membrane, sealed laps and compatible flashings carry rain to the outlets.

PV integration layer

Module supports transfer wind and gravity loads through the approved roof detail.

Electrical layer

PV strings feed an inverter. Protection and metering connect its AC output to the site distribution board.

Energy management (EMS)

Site meters and the battery controller supply data for dispatch within operating limits.

Safety & structure

The structural review, isolation plan, maintenance routes and fire access shape the layout.

Coupling methods

Select the roof attachment detail and confirm AC- or DC-coupled storage with the inverter supplier.

Data flow

Meters and inverter telemetry → EMS dispatch request → battery controller → measured response.

Design constraints

Verify uplift, roof loading, drainage, export limits and equipment access at the site.

What an integrated design gives you

Coordinated waterproofing

Detail seams, supports and cable entries together so each trade can inspect its interfaces.

Roof-specific mounting

Select attachments around the deck, slope and membrane system.

Direct use of solar

Serve coincident building loads with power generated on the roof.

Dispatchable storage

Schedule charging from surplus PV and discharge around the site load profile.

System visibility

Read generation, import, export and battery state together to check dispatch.

Clear service access

Reserve walkways and agree who can remove modules for a roof repair.

Explore the roof assembly

Rotate the exploded model to see how the modules, supports and waterproofing sit above the deck.

Exploded roof section showing the steel deck, insulation, waterproofing membrane, mounting rails and solar modules.
Illustrative roof section. The project design determines the fixing detail and materials for each layer.

System components

Roof envelope

Deck, insulation where specified, waterproof membrane, flashings and outlets.

Solar array

PV modules, rails or compatible supports, string cabling and inverter.

Battery system

Battery racks or cabinets, battery management, power conversion and protection.

Controls & metering

Generation and grid meters, site controller, communications and monitoring.

Technical specifications

Design itemSpecification basisVerify for your roof
Waterproof membraneReinforced TPO, 1.5 mm in the documented metal-roof assemblyDeck, seam design and membrane compatibility
Roof attachmentSingle-ply or fully adhered TPO configurationsFixing detail, adhesion and wind uplift
PV capacityProject-specific, expressed in kWp DCUsable roof area, shading and module selection
Storage ratingUsable energy (kWh) and converter power (kW) specified separatelyInterval demand, dispatch objective and operating limits
Grid interfaceOn-site self-consumption with surplus export where permittedConnection approval, export cap and switchgear
OperationsMetering at PV generation and the grid connectionTelemetry, inspection scope and service access

Application scenarios

Solar arrays on a Tangshan automotive factory

Factory roofs

Coordinate array fixing with the membrane and use daytime output on production lines.

Low-profile modules on a Haining logistics warehouse

Logistics warehouses

Match large roof areas to warehouse loads, cold-chain demand and export capacity.

Steel photovoltaic carport at the Tangshan factory

Solar carports

Extend generation to parking areas where the canopy structure and vehicle clearances allow.

A logistics roof in numbers

Guangzhou airport logistics park · Phase I

The October 2024 project report describes an SBS-waterproofed logistics roof. Its generation and consumption figures are design estimates for this project.

5 MW

Installed PV capacity

4.7869 GWh

Projected average annual generation

≈60%

Expected share used by the warehouses

To assess storage, compare the PV-only baseline with a battery dispatch model using the same interval load, weather and export limit. Compare grid imports, exported energy and peak demand.

Roof renewal, before and after

Move the divider to inspect the same illustrated roof detail before and after renewal.

Illustrated warehouse roof with weathered metal sheets and oxidized seams
Before
The same illustrated roof with a renewed membrane and PV arrays
After

Project questions

How is leakage risk addressed?

The roof survey identifies joints, drainage paths and penetrations. The design assigns a waterproofing detail to each support and cable entry, then records inspection and acceptance responsibilities.

What does the warranty cover?

Coverage follows the signed roof, module, inverter and battery warranties. Request the term, exclusions, workmanship scope and claims contact for each before award.

How much solar power will we consume on site?

The answer depends on the overlap between PV generation and your interval demand. Model a representative year, then compare direct use with a storage dispatch scenario.

Can the system go on an existing roof?

Yes, if the surveyed deck, structure and remaining roof life support it. Plan necessary waterproofing or strengthening work before installing modules.

How is payback calculated?

Compare installed cost with net annual savings from avoided purchases, permitted export revenue and demand changes. Include losses, service costs and battery replacement assumptions.

Who takes responsibility for roof and electrical interfaces?

Name a lead integrator in the contract. Assign roof detailing, structural review, electrical commissioning and aftercare in a responsibility schedule.

Which storage types can be considered?

AC-coupled storage can connect on the building AC side. DC-coupled storage shares a compatible DC interface. Select the battery chemistry, enclosure and converter against the operating duty.

How long does delivery take?

The programme follows survey, design, approvals, procurement, roof works, installation and commissioning. A site-specific schedule depends on permits, access and shutdown windows.

Discuss your roof project

Share the roof type, location and approximate area. Include your load profile or storage objective if you have one.