Commercial rooftop systems
Roof waterproofing, solar & storage
Plan the weatherproof envelope, rooftop PV and battery dispatch together, from the first roof survey to the operating handover.
Industrial rooftop PV array
Where rooftop projects run into trouble
Water at roof interfaces
Mounts, laps and service penetrations interrupt the drainage plane. Each interface needs a waterproofing detail.
Limited structural reserve
Existing decks and purlins may have little capacity for added modules, ballast or maintenance loads.
Generation outside demand hours
Midday PV output can exceed site demand, while evening operations still draw from the grid.
Gaps between contractors
Separate roof and electrical packages can leave leak tracing, repairs and access without a clear owner.
One roof, coordinated from the deck up
The membrane sheds water. The mounting system transfers loads to the structure. Above them, PV modules feed the site through an inverter. Storage can move surplus generation into a later demand period.
Choose the roof build-up first. On a metal deck, a fully adhered TPO membrane is one option. A single-ply TPO assembly uses a different fastening detail. Match the mounting interface to the selected assembly.
System architecture
Building waterproofing layer
Continuous membrane, sealed laps and compatible flashings carry rain to the outlets.
PV integration layer
Module supports transfer wind and gravity loads through the approved roof detail.
Electrical layer
PV strings feed an inverter. Protection and metering connect its AC output to the site distribution board.
Energy management (EMS)
Site meters and the battery controller supply data for dispatch within operating limits.
Safety & structure
The structural review, isolation plan, maintenance routes and fire access shape the layout.
Coupling methods
Select the roof attachment detail and confirm AC- or DC-coupled storage with the inverter supplier.
Data flow
Meters and inverter telemetry → EMS dispatch request → battery controller → measured response.
Design constraints
Verify uplift, roof loading, drainage, export limits and equipment access at the site.
What an integrated design gives you
Coordinated waterproofing
Detail seams, supports and cable entries together so each trade can inspect its interfaces.
Roof-specific mounting
Select attachments around the deck, slope and membrane system.
Direct use of solar
Serve coincident building loads with power generated on the roof.
Dispatchable storage
Schedule charging from surplus PV and discharge around the site load profile.
System visibility
Read generation, import, export and battery state together to check dispatch.
Clear service access
Reserve walkways and agree who can remove modules for a roof repair.
Explore the roof assembly
Rotate the exploded model to see how the modules, supports and waterproofing sit above the deck.
System components
Roof envelope
Deck, insulation where specified, waterproof membrane, flashings and outlets.
Solar array
PV modules, rails or compatible supports, string cabling and inverter.
Battery system
Battery racks or cabinets, battery management, power conversion and protection.
Controls & metering
Generation and grid meters, site controller, communications and monitoring.
Technical specifications
| Design item | Specification basis | Verify for your roof |
|---|---|---|
| Waterproof membrane | Reinforced TPO, 1.5 mm in the documented metal-roof assembly | Deck, seam design and membrane compatibility |
| Roof attachment | Single-ply or fully adhered TPO configurations | Fixing detail, adhesion and wind uplift |
| PV capacity | Project-specific, expressed in kWp DC | Usable roof area, shading and module selection |
| Storage rating | Usable energy (kWh) and converter power (kW) specified separately | Interval demand, dispatch objective and operating limits |
| Grid interface | On-site self-consumption with surplus export where permitted | Connection approval, export cap and switchgear |
| Operations | Metering at PV generation and the grid connection | Telemetry, inspection scope and service access |
Application scenarios

Factory roofs
Coordinate array fixing with the membrane and use daytime output on production lines.

Logistics warehouses
Match large roof areas to warehouse loads, cold-chain demand and export capacity.

Solar carports
Extend generation to parking areas where the canopy structure and vehicle clearances allow.
A logistics roof in numbers
Guangzhou airport logistics park · Phase I
The October 2024 project report describes an SBS-waterproofed logistics roof. Its generation and consumption figures are design estimates for this project.
5 MW
Installed PV capacity
4.7869 GWh
Projected average annual generation
≈60%
Expected share used by the warehouses
To assess storage, compare the PV-only baseline with a battery dispatch model using the same interval load, weather and export limit. Compare grid imports, exported energy and peak demand.
Roof renewal, before and after
Move the divider to inspect the same illustrated roof detail before and after renewal.


Project questions
How is leakage risk addressed?
The roof survey identifies joints, drainage paths and penetrations. The design assigns a waterproofing detail to each support and cable entry, then records inspection and acceptance responsibilities.
What does the warranty cover?
Coverage follows the signed roof, module, inverter and battery warranties. Request the term, exclusions, workmanship scope and claims contact for each before award.
How much solar power will we consume on site?
The answer depends on the overlap between PV generation and your interval demand. Model a representative year, then compare direct use with a storage dispatch scenario.
Can the system go on an existing roof?
Yes, if the surveyed deck, structure and remaining roof life support it. Plan necessary waterproofing or strengthening work before installing modules.
How is payback calculated?
Compare installed cost with net annual savings from avoided purchases, permitted export revenue and demand changes. Include losses, service costs and battery replacement assumptions.
Who takes responsibility for roof and electrical interfaces?
Name a lead integrator in the contract. Assign roof detailing, structural review, electrical commissioning and aftercare in a responsibility schedule.
Which storage types can be considered?
AC-coupled storage can connect on the building AC side. DC-coupled storage shares a compatible DC interface. Select the battery chemistry, enclosure and converter against the operating duty.
How long does delivery take?
The programme follows survey, design, approvals, procurement, roof works, installation and commissioning. A site-specific schedule depends on permits, access and shutdown windows.
Discuss your roof project
Share the roof type, location and approximate area. Include your load profile or storage objective if you have one.